Turnkey houses in Chișinău and across Moldova
Turnkey houses on your plot: we pour the foundation, raise the walls, put on the roof, run the utilities and do the finishes, until the house is ready to move into. We work to your design, with a stage-by-stage estimate signed before work starts.
Leave a request
The data is processed in line with the privacy policy.
Which house we build for you
A house can be handed over as a shell, white-box or turnkey, with walls in AAC block, cotileț stone, brick or ceramic block.
What a turnkey house includes
A turnkey house brings all three stages into one contract, from the structure to the final clean.
The shell
Foundation, walls, ring beams, floor slabs and roof: the frame that carries the rest of the house. The foundation depth comes from the design's soil survey, because many plots in Moldova sit on clay or loess that settles when wet.
Utilities
Water, drainage and wiring, run through walls and floors before plastering, to the room layout.
Plaster, skim coat and screed
We plaster the walls and pour the screed, so the surfaces are straight and ready for the finishes. Plaster and screed need a few weeks to dry.
Windows and the front door
With the windows and door in, the house is closed, so the inside work can carry on in winter if the house is heated.
Finishes
Tiles, parquet, bathroom fittings and doors go in once the screed is dry. You choose the materials for the interior finishing, and we tell you how much of each to buy.
The facade
Facade insulation in polystyrene or mineral wool, with a decorative render on top, done in warm weather.
What a turnkey house costs
A turnkey house has the highest price per m², because it includes both the shell and the white-box.
House shell
foundation, walls, floor slabs, roof, with materials
from5,800 lei / m²
- Reinforced concrete foundation
- External and internal walls
- Ring beams and floor slabs
- Roof with covering
White-box house
the shell plus utilities, plaster, screed and windows, with materials
from8,700 lei / m²
Everything in the shell, plus:
- Water, drainage and wiring
- Plaster and skim coat
- Floor screed
- Windows and the front door
Turnkey house
the white-box plus finishes, bathroom fittings and an insulated facade, with materials
from14,500 lei / m²
Everything in the white-box, plus:
- Tiles and parquet
- Bathroom fittings and interior doors
- Insulated facade
- Cleaning at handover
A house is priced per m² of built area, materials and labour included. Separate jobs are priced for labour: you buy the materials, or we bring them at the price on the receipt. The exact amount goes into the stage-by-stage estimate once we have seen the design, the plot and the soil.
All pricesWhite-box or turnkey?
Many people stop at the white-box: the house is closed, the utilities are in, the walls plastered and the screed poured. They then choose and do the finishes at their own pace, room by room. It is also the usual route on a tight budget: you pay for the shell and the white-box now and finish the rooms one at a time, as the money comes.
Turnkey spares you a second crew: one estimate, one person in charge of the site and one handover at the end. If a wall is out of line or the shower does not drain, the crew that did the plaster and the tiles puts it right. You can also start with the shell alone and sign the next stages when you are ready.
From the estimate to the keys
Each building stage ends with a sign-off together with you, and before any of them you get the estimate.
The stage estimate
We work out materials and labour from the design and give you the estimate split by stage before we sign the contract. From day one you know what each stage costs.
The shell
Foundation, walls, floor slab and roof. For a 100-150 m² house the shell usually takes 3-4 months, and we sign it off once the roof is on.
White-box
Utilities, plaster, screed and windows, usually another 2-3 months, most of it drying time.
Finishes and handover
We do the finishes, the facade and the final clean, then walk through the house with you, room by room, and hand you the keys.
Frequently asked questions
What papers does a turnkey house need?
An urban planning certificate (certificat de urbanism), the house design and a building permit from the town hall. The plot owner obtains them with the architect who draws the design; we build only to a design that has a building permit. If the design is still in progress, we give you a rough estimate from a sketch and redo it on the final design.
How long does a turnkey house take?
Usually 6-9 months for a 100-150 m² house: the shell, then the white-box, then the finishes. Concrete is not poured in frost, so a house started in autumn is usually finished the following summer.
Do you build timber-frame or modular houses?
No. We build masonry houses in AAC block, cotileț stone, brick and ceramic block, with reinforced concrete foundations, ring beams and slabs. Timber, steel-frame and modular houses are built by firms that specialise in those systems.
Have a plot and a design?
Tell us the floor area and the wall material, and we send you a stage-by-stage estimate before any contract is signed, as for all our house construction in Moldova.