Skip to content
House Construction MDComing soon...

House shell: foundation, walls, floor slab and roof

A house shell is the finished structure: foundation, walls, ring beams, floor slabs and roof. We build it in AAC block, cotileț stone or brick to your design, and you can do the utilities and finishes afterwards with us or with another crew.

Leave a request

The data is processed in line with the privacy policy.

House shell under a tiled roof, unplastered walls and empty window openings

What the shell includes

At handover the structure is complete and the roof is on, but there are no utilities, plaster or windows yet. The shell price includes materials: concrete, rebar, blocks, timber and the roof covering.

  • Foundation

    Excavation, rebar and plant-mixed concrete: the house foundation is poured to the design, usually a continuous strip. Between the foundation and the first course of masonry we lay a damp-proof layer, so ground moisture does not rise into the walls.

  • Walls

    We build the external and internal masonry in the chosen material, with openings for doors and windows, and set a reinforced concrete lintel over each opening.

  • Ring beams and slabs

    We pour reinforced concrete ring beams on every storey and a cast floor slab between the floors. The ring beams tie the walls together, so the whole house moves as one if the ground settles unevenly.

  • Roof

    The timber roof frame and covering: the roof closes the house before winter. Without it, rainwater sits on the slabs and soaks into the masonry.

What a house shell costs

All prices

If you want the structure in parts, we do the foundation, masonry, floor slab or roof separately, as labour.

WorkUnitPrice from
House shellfoundation, walls, floor slabs, roof, with materialsm²5,800 lei
Reinforced concrete strip foundationlabour: reinforcement and pouringm³900 lei
AAC block masonrylabour, on adhesivem³500 lei
Reinforced concrete floor slablabour: formwork, reinforcement and pouringm³1,550 lei
New metal-tile rooflabour: roof frame and coveringm²300 lei

A house is priced per m² of built area, materials and labour included. Separate jobs are priced for labour: you buy the materials, or we bring them at the price on the receipt. The exact amount goes into the stage-by-stage estimate once we have seen the design, the plot and the soil.

Interior walls of ceramic blocks with a ladder against the wall

Why the shell stage matters

Everything after the shell rests on it: a crooked wall needs thick plaster, and a missing ring beam shows up as cracks a few years later. That is why we build the shell to the design, with a level and plant-mixed concrete. Plant concrete comes in the grade the design specifies; concrete mixed on site in a small mixer comes out different with every batch.

You can order only the shell from us and carry on yourself, or go all the way to turnkey: both fit into the same stage-by-stage estimate. If you stop after the shell, the plumbers and plasterers you bring in later find straight walls and openings where the design puts them.

How we build the shell

For a 100-150 m² house the shell usually takes 3-4 months, as long as the weather allows concrete to be poured.

  1. Setting out and digging

    We set out the lines of the house and dig for the foundation to the depth in the design. The site needs power and water for the work; if they are not connected yet, we agree at the start how to bring them in.

  2. Foundation

    We set the formwork and rebar, pour the concrete and let it cure. In hot weather we keep it wet for a few days so it does not crack.

  3. Walls and slab

    We build the walls, pour the ring beams and the slab, then build the upper floor or attic. We only build on top once the slab concrete has gained enough strength.

  4. Roof and sign-off

    We fit the roof frame and covering, then check the structure together with you. At sign-off we measure the plumb of the walls and the opening sizes against the design.

Frequently asked questions

What is not included in a house shell?

Water, drainage and wiring, plaster, screed, windows and doors. These belong to the white-box, which you can order from us or from another crew. Connections to the mains in the street are not part of the per-m² price at any stage.

What does a 100 m² house shell cost?

For a first estimate, multiply the shell price per m² by the built area. The price goes up when weak soil needs a deeper foundation or when the roof has many slopes. We write the exact amount into the estimate from the design.

Can a shell stand over winter?

Yes, if the roof is on and the openings are covered. Winter does no harm to the structure; what matters is that water does not sit on the slabs or in the walls. In spring, once the walls have dried, you can start on the white-box.

Start with the structure

Send us the design and we tell you what the shell costs and how long it takes. Whenever you are ready, we carry on to turnkey house construction.

White house with an attic floor, a paved path and a lawn in the yard