We build the house foundation to the design: we dig, set the formwork, tie the rebar and pour concrete from the plant. We pour foundations for one- and two-storey houses in Chișinău and across Moldova, on their own or as the first stage of the house.

Leave a request

The data is processed in line with the privacy policy.

Worker levelling fresh concrete poured into the foundation formwork

What we do on a foundation

A reinforced concrete strip foundation goes through four jobs. Our own crew does them, and the concrete comes from the plant in a mixer truck.

  • Setting out and digging

    We set out the lines on the plot and dig to the depth in the design, below the frost line. On a slope or where groundwater is close, the design may call for a deeper foundation.

  • Formwork

    We set up formwork from panels or boards, straight and well braced. Formwork that gives way under the concrete spoils the shape of the foundation, so we check it before the pour.

  • Rebar

    We tie the rebar cage to the structural drawing, with spacers for the concrete cover. The spacers keep the bars inside the concrete so they do not rust.

  • Concrete

    We pour plant-mixed concrete and vibrate it so no voids remain. We order from the plant the concrete grade written in the design.

The price of a foundation

All prices

A foundation is priced per m³ of concrete poured, formwork per m² of panel set up.

WorkUnitPrice from
Reinforced concrete strip foundationlabour: reinforcement and pouringm³900 lei
Foundation formworklabour: setting up and strippingm²120 lei
House shellfoundation, walls, floor slabs, roof, with materialsm²5,800 lei

A house is priced per m² of built area, materials and labour included. Separate jobs are priced for labour: you buy the materials, or we bring them at the price on the receipt. The exact amount goes into the stage-by-stage estimate once we have seen the design, the plot and the soil.

Concrete poured from a hose into a foundation pit beside rebar

Which foundation we choose

Most houses in Moldova stand on a continuous strip foundation under the load-bearing walls. On weak or wet ground the design may call for a raft, a slab under the whole house. On clay and on loess, which settles when wet, as well as on slopes, the foundation is designed from a soil survey.

The depth and the rebar come from the design, and we pour exactly as it says. On top of the foundation come the masonry walls and the rest of the house shell. If the dig turns up something the survey did not show, such as water or old fill, we stop and tell you and the designer.

From setting out to striking the formwork

For an ordinary house the work usually takes two to three weeks, depending on its size.

  1. We check the design

    We read the foundation drawing and work out the concrete and rebar. We book the concrete for a set day so it all arrives in one go.

  2. Dig and set the formwork

    We dig and set the formwork on the lines. We clear loose soil from the bottom of the trench, so the concrete rests on firm ground.

  3. Reinforce and pour

    We tie the rebar, then pour all the concrete in a single day, without breaks. That way the foundation comes out in one piece, with no joints between pours.

  4. Cure and strike

    We keep the concrete wet for a few days in hot weather and strip the formwork once it has hardened. Then we apply the waterproofing and backfill around the foundation.

Frequently asked questions

What does a foundation for a 100 m² house cost?

It depends on the volume of concrete: the width and depth of the strip, the soil and the number of load-bearing walls. A house on a slope needs more concrete than one on flat ground. We work out the m³ from the design and give you the amount in the estimate, with labour and materials separate.

Can a foundation be poured in winter?

We do not pour in frost. In spring and autumn, in cold weather, the concrete is covered and protected so it cures properly. In summer heat it is kept wet for a few days so the surface does not crack.

Is the foundation different for a two-storey house?

Yes, it is usually wider or more heavily reinforced, because it carries more weight. The exact dimensions come from the design. For a two-storey house in cotileț or brick, which is heavier, the difference is bigger than for one in AAC.

Need a foundation?